Sign In | Join Free | My udpf.com
China Zhangjiagang HuaDong Boiler Co., Ltd. logo
Zhangjiagang HuaDong Boiler Co., Ltd.
Zhangjiagang HuaDong Boiler Co., Ltd.
Verified Supplier

9 Years

Home > Boiler Manifold Headers >

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

Zhangjiagang HuaDong Boiler Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

  • 1
  • 2
  • 3

Brand Name : HD Boiler

Model Number : Double H Fin Tube

Certification : ISO9001 , SGS , TUV , ASME , EN

Place of Origin : China

MOQ : 1 Set / Sets 10tons

Price : Negotiable

Payment Terms : L/C, T/T, Western Union

Supply Ability : 800 Tons / Year

Delivery Time : 50 Days

Packaging Details : Seaworthy Packing

Capacity : 660 MW

Type : ultra super critical

Material : 15CrMoG / 12Cr1MoVG

Working temperature : 445 deg C

Pressure : 32.1

Plant : Coal fired

Contact Now

Panel header 660 MW coal fired ultra super critical power plant working pressure 32.1MPa 445 deg C temperature
Product Description
1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

Details

1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

Features

1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

Classification

Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm
Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

Product Tags:

660MW header in boiler

      

660MW boiler header manifolds

      

12Cr1MoVG Coal Fired manifolds

      
Best Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant wholesale

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhangjiagang HuaDong Boiler Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)